
Wiring is the part you never see after painting, which is exactly why it should never be rushed. We run separate circuits for AC units, kitchen, lighting and sockets, with cable sized for the real load, not the bare minimum.
Whether you are building a villa, renovating an older flat or adding a rooftop extension, we plan the layout with you first and mark switch and socket positions before any wall is cut.
What the service includes
- Circuit layout and load calculation
- Copper cable in proper conduit
- Socket and switch boxes with earthing
- Insulation and continuity testing before closing walls
- Circuit schedule handed over at the end
When you need it
- Old or aluminium wiring
- Hot or scorched sockets
- Adding AC units or heavy appliances
- A full home renovation
How we work
- Request a visit
- Site inspection and diagnosis
- Agree the scope and cost
- Carry out the agreed work and tests
- Handover and clean-up
Before a wiring survey
List rooms, majlis, kitchen and annex, planned appliances and socket locations. Provide drawings if available and ask for a scope covering circuits, materials, finishing and tests.
How much does it cost?
The estimate depends on property size, number of points and circuits, existing wiring, materials and finishing work. We explain the scope after a survey.
Common questions about this service
Can you rewire without breaking all the walls?
Sometimes we use false-ceiling routes and neat surface trunking to reduce chasing. We decide what suits after the survey.
How long does a flat take?
It depends on size and building condition. We give you a schedule with the quote.




